What we plan on doing throughout
Week 8 involves ballasting the tank. We plan on using bags of sand placed in
the front and the back of the sub as ballasts. The only problem is we need to
figure out an easy way to adjust the bags of sand without reaching in all the
way into the back. We are also waiting for our USB extender to arrive so we can
transmit a signal over a long wire. After we successfully ballast the sub, we
have to start testing for any leaking we didn't cover and if our control system
is successful underwater.
We were also able to paint the whole outside of the sub. Pomo, who did an excellent job painting it, equipped the sub with a black and yellow covering with the Drexel dragon on the side.